Gallery
BEFORE
Client wanted new shaker panels and trim installed. Here you can see the before and after of adding the shaker panels and trim, and the final paint job.
BEFORE
AFTER
BEFORE
AFTER
AFTER
Client wanted a new sound board panel installation.
Began by removing the television, light fixtures, and brick.
Wall with everything removed.
The process of installing the new sound board panels.
The completed sound board panel installation.
Installed the light fixtures.
The completed installation with the television.
The client had some damage done to the closet door.
We went in and replaced the entire door.
This client had some water damage done to the baseboards.
We went in and replaced the baseboard, so it looks good as new.
Around the holidays, we offer light installations.
We installed Christmas lights along this client's trim of their house.
Customer complained about a loose and leaking toilet. Removed the toilet and found the wax ring was bad and closet flange was rusted and broken.
We cleaned up and removed wax ring and closet flange. We had to pour some cement to anchor the new repair closet flange.
Set and anchored new repair closet flange.
Applied a wood stain to client's work bench.
Replaced the outdoor light fixture with a modern upgrade.
Installed an awning to the window of this client's house.